Norges billigste bøker

Practical Schedule Risk Analysis

Om Practical Schedule Risk Analysis

Practical Schedule Risk Analysis, contains a complete treatment of schedule risk analysis from basic to advanced concepts. Benefits of the process, relationship to traditional critical path method scheduling and to project management, the role of the corporate culture in ensuring success and the criticality of collecting risk data are emphasized fo

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9781032837963
  • Bindende:
  • Paperback
  • Sider:
  • 240
  • Utgitt:
  • 24. juni 2024
  • Dimensjoner:
  • 245x173x17 mm.
  • Vekt:
  • 446 g.
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 24. august 2026

Beskrivelse av Practical Schedule Risk Analysis

Practical Schedule Risk Analysis, contains a complete treatment of schedule risk analysis from basic to advanced concepts. Benefits of the process, relationship to traditional critical path method scheduling and to project management, the role of the corporate culture in ensuring success and the criticality of collecting risk data are emphasized fo

Brukervurderinger av Practical Schedule Risk Analysis



Finn lignende bøker
Boken Practical Schedule Risk Analysis finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.