Norges billigste bøker

Integrated Cost-Schedule Risk Analysis

Om Integrated Cost-Schedule Risk Analysis

There are effective ways to estimate the impact on the cost of complex projects from project risks of various types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules. This book provides solutions for these and other challenges.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9780566091667
  • Bindende:
  • Hardback
  • Sider:
  • 220
  • Utgitt:
  • 28. mai 2011
  • Dimensjoner:
  • 177x250x20 mm.
  • Vekt:
  • 598 g.
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 24. august 2026

Beskrivelse av Integrated Cost-Schedule Risk Analysis

There are effective ways to estimate the impact on the cost of complex projects from project risks of various types, including traditional cost-type risks and the indirect but often substantial impact from risks usually thought of as affecting project schedules. This book provides solutions for these and other challenges.

Brukervurderinger av Integrated Cost-Schedule Risk Analysis



Finn lignende bøker
Boken Integrated Cost-Schedule Risk Analysis finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.