Norges billigste bøker

Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Om Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9781843397168
  • Bindende:
  • Paperback
  • Sider:
  • 302
  • Utgitt:
  • 30. juni 2004
  • Dimensjoner:
  • 156x234x18 mm.
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 20. januar 2025

Beskrivelse av Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the U.S. and U.K. to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.

Brukervurderinger av Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs



Finn lignende bøker
Boken Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.