Norges billigste bøker

Lifelong Leadership by Design

- How to Do More Good for Kids and Feel Better About Your Life's Work

Om Lifelong Leadership by Design

Offering practical advice for education leaders at all levels, this essential guide helps readers build a dynamic career by design - not by default - and leave a lasting legacy.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9781412969062
  • Bindende:
  • Paperback
  • Sider:
  • 208
  • Utgitt:
  • 1. desember 2009
  • Dimensjoner:
  • 177x254x12 mm.
  • Vekt:
  • 420 g.
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 7. september 2026

Beskrivelse av Lifelong Leadership by Design

Offering practical advice for education leaders at all levels, this essential guide helps readers build a dynamic career by design - not by default - and leave a lasting legacy.

Brukervurderinger av Lifelong Leadership by Design



Finn lignende bøker
Boken Lifelong Leadership by Design finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.