Norges billigste bøker

Delay Analysis in Construction Contracts

Om Delay Analysis in Construction Contracts

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9781118631171
  • Bindende:
  • Hardback
  • Sider:
  • 288
  • Utgitt:
  • 12. juni 2015
  • Utgave:
  • 2
  • Dimensjoner:
  • 252x179x19 mm.
  • Vekt:
  • 636 g.
  På lager
Leveringstid: 4-8 virkedager
Forventet levering: 17. september 2026

Beskrivelse av Delay Analysis in Construction Contracts

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.

Brukervurderinger av Delay Analysis in Construction Contracts



Finn lignende bøker
Boken Delay Analysis in Construction Contracts finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.