Norges billigste bøker

Construction Scheduling, Cost Optimization and Management

Om Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Vis mer
  • Språk:
  • Engelsk
  • ISBN:
  • 9780415244176
  • Bindende:
  • Hardback
  • Sider:
  • 338
  • Utgitt:
  • 25. januar 2001
  • Dimensjoner:
  • 156x234x25 mm.
  • Vekt:
  • 703 g.
  Gratis frakt
Leveringstid: 2-4 uker
Forventet levering: 28. september 2026

Beskrivelse av Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Brukervurderinger av Construction Scheduling, Cost Optimization and Management



Finn lignende bøker
Boken Construction Scheduling, Cost Optimization and Management finnes i følgende kategorier:

Gjør som tusenvis av andre bokelskere

Abonner på vårt nyhetsbrev og få rabatter og inspirasjon til din neste leseopplevelse.